Login Register
Follow Us

Constructed before Assembly elections, Ludhiana's Tibba Road breaks up at many points

Show comments

Tribune News Service

Harshraj Singh

Ludhiana, October 5

Within months after the construction work was done, Tibba Road here has broken at various points, raising questions over the quality of the material used. The road was constructed only a few months before the previous Assembly elections, which were held earlier this year, residents said.

Though the area falls under the Municipal Corporation, Ludhiana, this Tibba Road stretch was made of cement concrete by spending “crores of rupees” by the Ludhiana Improvement Trust. According to some civil engineers, a cement concrete road should last for 15-20 years.

The residents are upset over the poor quality of the road as it had started breaking down within a short period after the construction. A resident of the Tibba Road area, Sunil Nagpal, said: “The road had got damaged at various parts within only two months after its construction. I also remember patches were then laid on two spots but those got damaged too this rainy season. The matter should be taken seriously as to why the road started breaking down within a short time. Public money should not go waste.”

A shopkeeper said: “ Now, the road has started breaking down from various points in the absence of any check. The matter needs to be probed and samples must be collected to check the quality of material.”

The office of Ludhiana East MLA Daljit Singh Grewal (Bhola) is also located on Tibba Road.

Bhola said the road was constructed by the LIT around two months before the Assembly elections. “It has broken at many points now. The contractor has been asked to reconstruct the road, otherwise the matter would be taken up before the Vigilance Department. The road project cost was about Rs 4 crore,” he said.

Kapil Arora, president of the Council of Engineers, an NGO, said: “Cement concrete roads are generally designed for a life span of 20 years. Such roads require only routine maintenance. If Tibba Road started breaking down within months, the authorities concerned should take the matter seriously and take necessary action too.”

Ludhiana Improvement Trust’s Superintending Engineer Rakesh Garg said he would look into the matter and action would be taken.

Contractor told to reconstruct stretch

Tibba Road has broken at many points now. The contractor has been asked to reconstruct it, failing which the matter will be taken up before the Vigilance Department. The project cost was about Rs 4 crore. — Daljit Singh Grewal, Ludhiana East MLA

About The Author

The Tribune News Service brings you the latest news, analysis and insights from the region, India and around the world. Follow the Tribune News Service for a wide-ranging coverage of events as they unfold, with perspective and clarity.

Show comments
Show comments

Trending News

Also In This Section


Top News


View All

10-year-old Delhi boy runs food cart to support family after father’s death; businessman offers help

Sharing a video on X, Anand Mahindra extends support to the boy

Indian-origin astronaut Sunita Williams set to fly into space again on first crewed mission of Boeing's Starliner

Williams, 59, a retired US Navy captain, and Wilmore will pilot the flight

Gurbani rings out at UK Parliament complex for Baisakhi

The event is organised by the British Indian think-tank 1928 Institute and diaspora membership organisations City Sikhs and the British Punjabi Welfare Association


Most Read In 24 Hours