Login Register
Follow Us

Quarterly review of operational preparedness must for single-engine aircraft flights in bad weather or at night, DGCA tells operators

DGCA has asked operators to devise a process to obtain feedback from the crew, flight data analysis and in-flight inspections on issues critical to operations

Show comments

Tribune News Service

Vijay Mohan

Chandigarh, October 25

The Directorate General of Civil Aviation (DGCA) has asked operators of single-engine aircraft to periodically review their operational preparedness every three months for undertaking flights at night or in adverse weather conditions.

In its revised directives for single-engine turbine aircraft operations issued this week, DGCA has asked operators to devise a process to obtain feedback from the crew, flight data analysis and in-flight inspections on issues critical to operations.

The directives, revised about five years after they were last issued, are applicable to scheduled commuter air transport operations and non-scheduled air transport operators with single-engine turbine airplane having and all-up weight of not more than 5,700 kg and single engine turbine helicopter having all-up weight of not more than 3,175 kg.

Operators are mandated to establish a positive means of identifying the emergency landing site during night and in instrument meteorological conditions (IMC). The assessment of the landing sites should be based on the risk assessment at least quarterly and any change in the character of the site should be documented and be made part of the flight planning.

IMC is a weather condition that requires pilots to fly primarily by reference to flight instruments and under instrument flight rules instead of flying by outside visual references under visual flight rules because of visibility issues.

Since accurate weather assessment is essential for the safe operation during flight in IMC and situational awareness of pilots about terrain and obstacles is critical in case of diversion, aircraft being used in IMC or night operations should be equipped with auto-function colour weather radar as well as ground proximity warning system or terrain avoidance and warning system.

DGCA has also directed that operators shall have a phase-wise approach towards introducing night operations, for which the crew should first be cleared for day operations and meet compliance of DGCA requirements. They shall be cleared for the night operations for particular sectors based upon demonstration of effective compliance and risk mitigation.

Reliable and approved sources are to be used for weather determination throughout the flight and elaborative route briefing is to be carried out at pre-flight and during progression of flight. For operations over water in IMC or at night, route limitations are to be assessed and the distance that the aeroplane may be operated from a land mass suitable for a safe forced landing should be determined.

About The Author

The Tribune News Service brings you the latest news, analysis and insights from the region, India and around the world. Follow the Tribune News Service for a wide-ranging coverage of events as they unfold, with perspective and clarity.

#DGCA

Show comments
Show comments

Trending News

Also In This Section


Top News


View All

40-year-old Delhi man takes 200 flights in 110 days to steal jewellery from co-passengers, would assume dead brother’s identity

2 separate cases of theft were reported on separate flights in the past three months, after which a dedicated team from IGI Airport was formed to nab the culprits

Mother's Day Special: How region’s top cops, IAS officer strike a balance between work and motherhood

Punjab DGP Gurpreet, Himachal DGP Satwant, Chandigarh SSP Kanwardeep, Ferozepur SSP Saumya, IAS officer Amrit Singh open up on the struggles they face

Enduring magic of Surjit Patar: A tribute to Punjab’s beloved poet

A tribute to Punjab’s beloved poet, who passed away aged 79 in Ludhiana


Most Read In 24 Hours